forked from Minki/linux
EHCI : Fix a regression in the ISO scheduler
Fix a regression that was introduced by commit
811c926c53
(USB: EHCI: fix HUB TT scheduling
issue with iso transfer).
We detect an error if next == start, but this means uframe 0 can't be allocated
anymore for iso transfer...
Reported-by: Sander Eikelenboom <linux@eikelenboom.it>
Signed-off-by: Matthieu CASTET <castet.matthieu@free.fr>
Acked-by: Alan Stern <stern@rowland.harvard.edu>
Signed-off-by: Greg Kroah-Hartman <gregkh@suse.de>
This commit is contained in:
parent
df711fc996
commit
e3420901eb
@ -1475,6 +1475,7 @@ iso_stream_schedule (
|
||||
* jump until after the queue is primed.
|
||||
*/
|
||||
else {
|
||||
int done = 0;
|
||||
start = SCHEDULE_SLOP + (now & ~0x07);
|
||||
|
||||
/* NOTE: assumes URB_ISO_ASAP, to limit complexity/bugs */
|
||||
@ -1492,18 +1493,18 @@ iso_stream_schedule (
|
||||
if (stream->highspeed) {
|
||||
if (itd_slot_ok(ehci, mod, start,
|
||||
stream->usecs, period))
|
||||
break;
|
||||
done = 1;
|
||||
} else {
|
||||
if ((start % 8) >= 6)
|
||||
continue;
|
||||
if (sitd_slot_ok(ehci, mod, stream,
|
||||
start, sched, period))
|
||||
break;
|
||||
done = 1;
|
||||
}
|
||||
} while (start > next);
|
||||
} while (start > next && !done);
|
||||
|
||||
/* no room in the schedule */
|
||||
if (start == next) {
|
||||
if (!done) {
|
||||
ehci_dbg(ehci, "iso resched full %p (now %d max %d)\n",
|
||||
urb, now, now + mod);
|
||||
status = -ENOSPC;
|
||||
|
Loading…
Reference in New Issue
Block a user